Friday 14 March 2014

CE 1401– ESTIMATION AND QUANTITY SURVEYING

CE 1401– ESTIMATION AND QUANTITY SURVEYING
DURATION: 3 Hrs         DATE: 07.10.2013                 MAX.MARKS:100

PART-A                                         10 x 2 = 20
  1. Define estimation.
  2. Define analysis of rates.
  3. What are the types of estimate?
  4. Define a tender.
  5. Define contract.
  6. What are the main components of culvert?
  7. Define lead and lift.
  8. Define floor area and carpet area.
  9. Briefly explain about bay method.
  10. What is specification?

                                                 PART-B                                                  5x 16 = 80
    
11.                     a.i) Explain the various types of estimate?(8)
          ii) Explain the various methods of estimate?(8)
                                                       (OR)

             b. Estimate the single room building of 30m2.(16)
        12  a. i) What are the methods of estimation of roads.(8) 
                  ii) Explain briefly about sanitary and water supply fittings?(8)                                
                                                                           (OR)                        
            b. Estimate a retaining wall.(16)
                                           
13.a)  i) What are the types of contract.(8)
                ii) Explain about arbitration.(8)
                                                                           (OR)
b) i) Describe about the types of specification. (8)
    ii) Explain about the stages of tender. (8)
14 a) Explain the methods of depreciation.(16)
                                                               (OR)
     b) Explain the methods of valuation. (16)
15 a) Write a report on residential building.(16)
                                                               (OR)

     b) Write a report on roads.(16) 

No comments:

Post a Comment