CE 1401– ESTIMATION AND
QUANTITY SURVEYING
DURATION: 3 Hrs DATE: 07.10.2013 MAX.MARKS:100
PART-A 10 x 2 = 20
- Define estimation.
- Define analysis of rates.
- What are the types of estimate?
- Define a tender.
- Define contract.
- What are the main components of culvert?
- Define lead and lift.
- Define floor area and carpet area.
- Briefly explain about bay method.
- What is specification?
PART-B 5x 16 = 80
11.
a.i) Explain the various types of estimate?(8)
ii) Explain the
various methods of estimate?(8)
(OR)
b. Estimate the single room building of 30m2.(16)
12 a.
i) What are the methods of estimation of roads.(8)
ii) Explain briefly about
sanitary and water supply fittings?(8)
(OR)
b. Estimate a retaining wall.(16)
13.a) i) What
are the types of contract.(8)
ii) Explain about
arbitration.(8)
(OR)
b) i) Describe about the types of specification. (8)
ii) Explain about the
stages of tender. (8)
14 a) Explain the methods of depreciation.(16)
(OR)
b) Explain the methods of
valuation. (16)
15 a) Write a report on residential building.(16)
(OR)
b) Write a report on
roads.(16)